On September, 18th, 2009 at Roslavl wagon repair plantthe automatic line for manufacturing a railway vehicle axle is put intooperation. Capacity of the line is 24 000 axles a year.
STANEXIM has acted as the general contractor of this project and has carried out the general management of the project, delivery oft he equipment and engineering works. The line has united an engineering idea and the equipment of Belarus, Ukraineand Germany.
During acquaintance with work of the automatic transfer line the first axis has passed through all operations and has been recognized by the monitoring system of quality suitable on all parameters. Guests and participants of the project have put the autographs on the first axle made at RVRZ. The axis is transferred to the plant museum.
We congratulate all participants of the project with successful finish and desire new interesting projects!